Planning a project? Tell us a little about it and we can point you to the right person.
Menu
Menu

Fire Safety

Residential Fire Strategy and Part B | Landmark Group
Protected staircase in a Landmark residential project

FIRE SAFETY

Designed in. Built to. Signed off.

1997Founded
5×International Property Awards
10+In-House Specialists
5Professional Accreditations

Fire safety is the part of Building Regulations that is cheapest to resolve on paper and most expensive to resolve on site. Escape routes, protected stairs, compartmentation and detection all shape the plan, so they belong in the drawing from the start rather than in a report written against it afterwards.

Landmark is accredited by the Institute of Fire Safety Management, and the strategy is produced by the same team drawing the building. The questions that usually travel between a fire consultant and an architect get answered in one room.

Fire Safety

WHAT WE OFFER?

Every service below states what the work covers and what you receive at the end of it.

01

FIRE STRATEGY, PART B

The document setting out how the building performs in a fire: escape, compartmentation, detection and access for the fire service.

You receiveA written strategy drawn into the scheme rather than written beside it.
02

MEANS OF ESCAPE AND PROTECTED STAIRS

Travel distances, stair protection and final exits decide the plan more often than people expect, especially once a loft becomes a third storey.

You receiveEscape routes and stair protection shown on the approved drawings.
03

COMPARTMENTATION AND FIRE-STOPPING

Walls and floors only perform if the penetrations through them are detailed and installed properly.

You receiveWall, floor and penetration detailing specified for the contractor to build to.
04

ALARM, DETECTION AND SIGN-OFF

The detection specification and the evidence building control asks for before it will sign the scheme off.

You receiveThe specification and the commissioning evidence building control asks for.
The process

HOW IT WORKS?

Four stages, one team, no handover between firms.

  1. 01

    REVIEW

    The scheme assessed against Part B as currently drawn.

  2. 02

    STRATEGY

    The fire strategy written and the drawings adjusted to suit.

  3. 03

    SUBMISSION

    Strategy and drawings submitted, queries answered.

  4. 04

    SIGN-OFF

    Installation checked and the compliance evidence closed out.

Why Landmark

WHY CHOOSE US?

Accredited by the Institute of Fire Safety Management.
The strategy is written by the team drawing the building, so it shapes the plan rather than arguing with it.
Resolved at design stage, where a change costs a drawing revision rather than a rebuild.
Accredited byICECIOBCIATIFSMCONTROL4
Keep exploring

RELATED SERVICES

RESOLVE FIRE SAFETY ON PAPER, NOT ON SITE

Send us the drawings, and we can talk through how fire safety shapes the plan.

Website designed by RRAHBRIDGE Ltd