
BUILDING REGULATIONS
Drawn in detail. Built to the drawing. Taken through to sign-off.
Planning permission tells you a building is acceptable. Building Regulations approval tells you it is safe, warm, accessible and legal. The two are not the same, and the gap between them is where most residential programmes lose a month.
We carry a scheme through Building Regulations in step with the build, so structure, fire safety, energy and access are resolved properly and on time rather than renegotiated on site.
This is the detail nobody sees and everybody relies on. It is also the paperwork a buyer's solicitor will ask for years later, so we produce it to be kept.
WHAT WE OFFER?
Every service below states what the work covers and what you receive at the end of it.
BUILDING REGULATIONS DRAWING PACKAGES
The full technical submission covering construction details, build-ups, insulation, drainage, ventilation and setting out.
BUILDING CONTROL LIAISON
We choose the route, local authority or registered building control approver, make the submission and handle the correspondence.
FIRE SAFETY
Escape routes, compartmentation, protected stairs and detection, resolved at design stage where it costs a drawing revision rather than a rebuild.
SAP AND ENERGY ASSESSMENT
Part L compliance proved against the design and again against the house as built.
ACCESS, PART M
Level thresholds, door widths, circulation and sanitary provision designed in, so the house works for everyone who uses it.
INSPECTIONS TO COMPLETION CERTIFICATE
Site stages booked, attended and closed out.
HOW IT WORKS?
Four stages, one team, no handover between firms.
- 01
REVIEW
The approved scheme assessed against current regulations.
- 02
PACKAGE
Technical drawings and calculations prepared and submitted.
- 03
APPROVAL
Queries answered, conditions discharged, approval issued.
- 04
SIGN-OFF
Stage inspections through construction to completion certificate.
WHY CHOOSE US?
RELATED SERVICES
PLAN YOUR BUILDING REGULATIONS PACKAGE
Send us the approved drawings, and we can talk through what the Building Regulations package involves.