BUILDING REGULATIONS

Drawn in detail. Built to the drawing. Taken through to sign-off.

1997Founded
5×International Property Awards
10+In-House Specialists
5Professional Accreditations

Planning permission tells you a building is acceptable. Building Regulations approval tells you it is safe, warm, accessible and legal. The two are not the same, and the gap between them is where most residential programmes lose a month.

We carry a scheme through Building Regulations in step with the build, so structure, fire safety, energy and access are resolved properly and on time rather than renegotiated on site.

This is the detail nobody sees and everybody relies on. It is also the paperwork a buyer's solicitor will ask for years later, so we produce it to be kept.

Building Regulations

WHAT WE OFFER?

Every service below states what the work covers and what you receive at the end of it.

01

BUILDING REGULATIONS DRAWING PACKAGES

The full technical submission covering construction details, build-ups, insulation, drainage, ventilation and setting out.

You receiveThe drawing set and written specification, lodged with building control on your behalf.
02

BUILDING CONTROL LIAISON

We choose the route, local authority or registered building control approver, make the submission and handle the correspondence.

You receiveThe submission and the correspondence handled on your behalf.
03

FIRE SAFETY

Escape routes, compartmentation, protected stairs and detection, resolved at design stage where it costs a drawing revision rather than a rebuild.

You receiveA written fire strategy drawn into the scheme.
Explore fire safety
04

SAP AND ENERGY ASSESSMENT

Part L compliance proved against the design and again against the house as built.

You receiveBoth calculations and the Energy Performance Certificate.
Explore SAP and energy assessment
05

ACCESS, PART M

Level thresholds, door widths, circulation and sanitary provision designed in, so the house works for everyone who uses it.

You receiveLayouts designed to Part M, shown on the drawings.
06

INSPECTIONS TO COMPLETION CERTIFICATE

Site stages booked, attended and closed out.

You receiveThe inspection record and the completion certificate once issued.
The process

HOW IT WORKS?

Four stages, one team, no handover between firms.

  1. 01

    REVIEW

    The approved scheme assessed against current regulations.

  2. 02

    PACKAGE

    Technical drawings and calculations prepared and submitted.

  3. 03

    APPROVAL

    Queries answered, conditions discharged, approval issued.

  4. 04

    SIGN-OFF

    Stage inspections through construction to completion certificate.

Why Landmark

WHY CHOOSE US?

Compliance is drawn into the design by the team that designed it, so it is part of the scheme from the start rather than added later.
Fire safety and energy assessment sit in house rather than with two separate consultants, which removes the handover where programmes lose time.
Accredited by ICE, CIOB, CIAT, IFSM and Control4.
Accredited byICECIOBCIATIFSMCONTROL4
Keep exploring

RELATED SERVICES

PLAN YOUR BUILDING REGULATIONS PACKAGE

Send us the approved drawings, and we can talk through what the Building Regulations package involves.

Website designed by RRAHBRIDGE Ltd